Movement of 2 compressors (9m x 7.5m x 6.5m, 170 tons each). Cranage from coaster, transport and installation all undertake by ourselves. (1)
Set 2 Photo 1
 
Movement of 2 compressors (9m x 7.5m x 6.5m, 170 tons each). Cranage from coaster, transport and installation all undertake by ourselves. (2)
Set 2 Photo 2
 
Movement of 2 compressors (9m x 7.5m x 6.5m, 170 tons each). Cranage from coaster, transport and installation all undertake by ourselves. (3)
Set 2 Photo 3
 
Movement of 2 compressors (9m x 7.5m x 6.5m, 170 tons each). Cranage from coaster, transport and installation all undertake by ourselves. (4)
Set 2 Photo 4
 
Movement of 2 compressors (9m x 7.5m x 6.5m, 170 tons each). Cranage from coaster, transport and installation all undertake by ourselves. (5)
Set 2 Photo 5
 
The first of 2 storage tanks (40' high and 40' diameter) moved on site at Invergordon Distillery (1)
Set 3 Photo 1
 
This shows a boiler lifted for loading onto one of our trailers using one of four hydraulic lift systems (1)
Set 14 Photo 1
 
A boiler being installed at the customers premises (1)
Set 15 Photo 1
 
A boiler being installed at the customers premises (2)